The 34 foot entrance portal has been put up |
|
|
|
|
|
|
|
|
|
|
|
|
Eighteen bolts fasten the portal down to the pads |
|
|
|
|
|
|
|
|
|
|
|
|
Some of the bracing connecting the portal to the building |
|
|
|
|
|
|
|
|
|
|
|
|
The Toyota logo will be placed on the upper right side of the portal
|
|
|
|
|
|
|
|
|
|
|
|
|
Six brackets will hold the Toyota logo |
|
|
|
|
|
|
|
|
|
|
|
|
The Dry Ridge name in place |
|
|
|
|
|
|
|
|
|
|
|
|
The Service Department floor is being graded in preparation for pouring concrete |
|
|
|
|
|
|
|
|
|
|
|
|
Steel reinforcing mats will be put down prior to the pour |
|
|
|
|
|
|
|
|
|
|
|
|
The garage drain system will be bolted down in the middle of the floor prior to the finish concrete being poured |
|
|
|
|
|
|
|
|
|
|
|
|
The Parts entrance from the garage |
|
|
|
|
|
|
|
|
|
|
|
|
A counter will be set up here for technicians to get their parts |
|
|
|
|
|
|
|
|
|
|
|
|
A lift will be used to get items to the second floor of parts |
|
|
|
|
|
|
|
|
|
|
|
|
Looking into parts from the delivery entrance |
|
|
|
|
|
|
|
|
|
|
|
|
The car wash and detailaing area adjacent to Service |
|
|
|
|
|
|
|
|
|
|
|
|
In the Scion Showroom looking towards the Toyota Showroom |
|
|
|
|
|
|
|
|
|
|
|
|
Ductwork being installed in the Toyota Showroom |
|
|
|
|
|
|
|
|
|
|
|
|
Sprinkler piping is being installed also |
|
|
|
|
|
|
|
|
|
|
|
|
The front entrance coming together |
|
|
|
|
|
|
|
|
|
|
|
|
The second floor is being divided into offices |
|
|
|
|
|
|
|
|
|
|
|
|
|
In the file storage area looking towards the front of the building |
|
|
|
|
|
|
|
|
|
|
|
|
There will be a quiet lounge at the top of the main staircase |
|
|
|
|
|
|
|
|
|
|
|
|
A conference room will be located to the right here with two of the walls marked out on the floor |
|
|
|
|
|
|
|
|
|
|
|
|
Second floor ductwork going up |
|
|
|
|
|
|
|
|
|
|
|
|
Looking at the main entrance from the second floor |
|
|
|
|
|
|
|
|
|
|
|
|
There will be a break room on the right and general office space on the left |
|
|
|
|
|
|
|
|
|
|
|
|
Garage preparation continues with a drain being laid down in the center of the room |
|
|
|
|
|
|
|
|
|
|
|
|
Most of the reinforcement is in place |
|
|
|
|
|
|
|
|
|
|
|
|
The main entrance to the Scion showroom, with a smaller door to the elevator equipment room to its right |
|
|
|
|
|
|
|
|
|
|
|
|
On the opposite side of Scion from the Toyota Showroom is the Parts Display Area and Retail Window |
|
|
|
|
|
|
|
|
|
|
|
|
The Service Reception Area has been graded and the center drain installed in preparation for concrete |
|
|
|
|
|
|
|
|
|
|
|
|
The Service Garage floor has been poured and crews are preparing the alignment bay in the back |
|
|
|
|
|
|
|
|
|
|
|
|
A wall is being put up between the Car Wash and Vehicle Detail Area |
|
|
|
|
|
|
|
|
|
|
|
|
The transformer pad has been laid down outside service |
|
|
|
|
|
|
|
|
|
|
|
|
Frames for the showroom windows have arrived |
|
|
|
|
|
|
|
|
|
|
|
|
A barrier has been put on over the exterior wood to prevent moisture from getting in |
|
|
|
|
|
|
|
|
|
|
|
|
The wiring for the Toyota logo and name have been pulled through the front entrance portal |
|
|
|
|
|
|
|
|
|
|
|
|
The entrance vestibule work continues |
|
|
|
|
|
|
|
|
|
|
|
|
Wallboard is being moved to the second floor |
|
|
|
|
|
|
|
|
|
|
|
|
In between Parts and Service, the walls are going up on the Technician's Lounge and locker room |
|
|
|
|
|
|
|
|
|
|
|
|
In a corner of the garage is the pit for the alignment bay and one of the electrical closets |
|
|
|
|
|
|
|
|
|
|
|
|
The Service Department electrical closet |
|
|
|
|
|
|
|
|
|
|
|
|
Portions of the lot have been restaked prior to additional grading |
|
|
|
|
|
|
|
|
|
|
|
|
Light pole bases run parallel to Meeks Rd. |
|
|
|
|
|
|
|
|
|
|
|
|
The transformer has been put into place |
|
|
|
|
|
|
|
|
|
|
|
|
The wall enclosing the second floor of Parts from the Service Garage is framed |
|
|
|
|
|
|
|
|
|
|
|
|
Looking down at Scion from Parts |
|
|
|
|
|
|
|
|
|
|
|
|
The second floor of Parts looking toward the steps and delivery door |
|
|
|
|
|
|
|
|
|
|
|
|
The second floor Parts delivery area |
|
|
|
|
|
|
|
|
|
|
|
|
The Showroom window frames are being installed |
|
|
|
|
|
|
|
|
|
|
|
|
The windows are about 20 feet high |
|
|
|
|
|
|
|
|
|